This 225kw Micon M700 (35m tower) wind turbine is located near Pyle in South Wales. The turbine was commissioned in July 2015 and supplies low cost, low carbon electricity to the adjacent dairy, reducing carbon emissions by some 7,000 tonnes over the life of the project.
Whatever stage you’re at, Sirius Group can help!
Send us a quick enquiry or call a local office, offices listed below.
How can we help?