Page loading

loading icon

Bennett Bank Turbine

This 500kw EWT DW52 (35m tower) wind turbine, was commissioned in September 2016 and is located at FCC Environments Bennett Bank landfill site, near Barrow in Furness, Cumbria. The turbine is expected to produce some 1.5 million kwhs of low carbon electricity per annum for export to the grid, reducing carbon emissions by some 16,500 tonnes over the life of the project.

Sectors:
Energy
Minerals and Waste

Services:
Renewable Energy
Civils
Environmental
Planning

Location: Open in Google Maps

 

Let’s discuss your projects

Whatever stage you’re at, Sirius Group can help!

Send us a quick enquiry or call a local office, offices listed below.

How can we help?